logo
Luoyang Mckee Intelligent Technology Co.,LTD
english
français
Deutsch
Italiano
Русский
Español
português
Nederlandse
ελληνικά
日本語
한국
العربية
हिन्दी
Türkçe
bahasa indonesia
tiếng Việt
ไทย
বাংলা
فارسی
polski

Détails des produits

Created with Pixso. Maison Created with Pixso. Produits Created with Pixso.
Station de recharge pour véhicules électriques
Created with Pixso.

DC Fast Charging Station Electric Charging Pile Electric Charging Station With RFID 4g Commercial Use

DC Fast Charging Station Electric Charging Pile Electric Charging Station With RFID 4g Commercial Use

Nom De Marque: Mckee Charging Cube
Numéro De Modèle: CLF-DC-120KW
Nombre De Pièces: 1
Prix: Negotiate
Conditions De Paiement: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Informations détaillées
Place of Origin:
Luoyang, China
Certification:
CE/UL/CHAdeMO
Prophylactic:
Temperature protection
Charging Time:
20-40 mins (10-80%)
Rated Power:
DC 120kW
Input voltage:
480 VAC
Output voltage:
220-1000V DC Constant
Output power:
120KW
Charging interface:
CCS2/CCS1/CHAdeMO
Protection level:
IP54
Warranty:
24 months
Certifed:
CE/UL/CHAdeMO
RFID System:
OCPP1.6,WIFI,3/4G,pose
Charging Cable Length:
5m
Packaging Details:
Wooden case packaging
Description du produit

DC fast charging station electric charging pile electric charging station with RFID 4g commercial use

Fast Charging Speed – Suitable for most EVs, delivers ~80% charge in 20-40 mins (varies by battery size).
Dual-Port Flexibility – Often supports CCS + CHAdeMO or dual CCS connectors.
Cost-Effective – Lower installation and operational costs vs. ultra-rapid chargers.
Wide Compatibility – Works with most EVs (except some high-voltage models).
 

Technical Parameters:

Parameter Specification
Power Output 120kW (max)
Voltage Range 200-1000V DC
Current Output Up to 300A
Connector Types CCS1/CCS2, CHAdeMO (optional)
Efficiency ≥93%
Cooling System Liquid-cooled cables (optional)
Grid Compatibility 3-phase AC, 380-480V
Dimensions ~800x600x1800mm (varies by model)
Weight 300-500kg
 
Type Power Range Charging Time (Example) Use Case
120kW DC Fast 30–40 mins (80%) Public fast-charging
7kW–22kW AC Slow 6–10 hours (100%) Home/workplace
350kW+ Ultra-Fast 15–20 mins (80%) Premium charging hubs
 

Best For:

  • Highway rest stops

  • Urban fast-charging hubs

  • Fleet operators